Baxi TS Super Installation And Servicing Instructions page 7

Bermuda inset 3 super fireside gas central heating units
Table of Contents

Advertisement

1
3.0 Site Requirements
3.3
Ventilation
1. Ventilation air supply should be in accordance
with the relevant standards. In GB this is BS
5440 Pt 2. In IE this is the current edition of I.S.
813 "Domestic Gas Installations".
The permanent ventilation area size
requirements are as shown:
80.1cm
2
2. The permanent vent may be directly into the
room containing the appliance. The vent may
also be sited in another (not a bedroom, toilet,
bathroom or kitchen) room provided an
interconnecting vent is used.
3. The vent must not be installed inside the
builders opening. The vent should be sited
following good practice for a habitable room.
4. We recommend the use of the Stadium
BM720 "Black Hole" ventilator which is available
from your local merchant.
3.4
Gas Supply
1. The gas installation should be in accordance
with the relevant standards. In GB this is BS
6891. In IE this is the current edition of I.S. 813
"Domestic Gas Installations".
2.The gas supply to the fire is provided from the
service cock on the boiler using the supply pipe
provided in the fire kit. The pipe is the correct
length and will not need shortening.
12.42in
2
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents