Baxi TS Super Installation And Servicing Instructions page 11

Bermuda inset 3 super fireside gas central heating units
Table of Contents

Advertisement

Fire Surround Trim
Bottom
Lug
Fig. 12
Boiler Hood
Flue
Spigot
Fig. 14
Control Panel Connector
Fig. 15
from Fire Surround
Fig. 11
Control Panel
Assembly
Fire Surround Trim
Base Tray Securing Screw
Fig. 16
5.0 Installation
5.4
1. Remove the fire surround trim from its poly
bag (Fig. 11). The fire surround should be
handled with care.
2. Position the fire surround trim around the fire
combustion box and lower it into position, taking
care not to trap the cable from the control panel
assembly, ensure that the top lugs locate on to
the top of the fire combustion box and the
bottom lugs locate into the slots in the sides of
the combustion box (Fig. 12).
3. Insert the plug connector from the control
panel assembly into the socket on the front of
the valve bracket (Fig. 15).
4. Position the fire on to the boiler base and
slide back, ensuring that the flue spigot locates
into the downdraught diverter on the boiler.
Push the fire back into the opening. Look
through the fire to align the two slots in the flue
spigot with the holes in the boiler hood (Figs. 13
& 14).
5. Fit and tighten the two screws that secure the
fire combustion box to the front corners of the
boiler base tray (Figs. 13 & 16).
6. Fit the two screws inside the fire flue spigot.
Push the fire back and tighten the two screws.
(Fig. 14).
Fig. 13
Fitting the Fire
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents