Baxi TS Super Installation And Servicing Instructions page 10

Bermuda inset 3 super fireside gas central heating units
Table of Contents

Advertisement

Fig. 10b
3 Pin Electrical Plug
Mains Inlet Cable
Boiler Base
Fig. 10d
Inlet Plug
Mains Inlet Cable Clamp
10
4 Pin Electrical Plug
Cutouts
Fig. 10c
SL
Fire Cable Clamp
SL
L
From Control System
& Permanent Live
5.3
1. Take the 3 pin plug and lead assembly from
the gas fire contents kit.
2. Remove the 4 pin electrical plug from the boiler
(Figs.10b), remove the cover from the 4 pin plug
and undo the cable clamps (Fig. 10d).
3. Route the mains inlet cable under the boiler
base through the cutouts (Fig. 10c).
IMPORTANT: The mains inlet cable must be
routed under the boiler base to ensure that it
cannot interfere with the transformer box on
the fire front.
4. The boiler plug is supplied as shown; An earth
lead connects to the boiler chassis (Fig. 10e).
5. Wire the plug as Fig. 10f.
Connect the control switched live to SL.
Connect neutral to N and earth to
Connect the permanent live to L.
The fire earth must connect to the chassis.
Neutral and live of the fire supply cable can then
be connected to N and L respectively.
L
N
6. Re-fit the cable clamps ensuring that the outer
insulation is securely held and re-fit the plug
cover. Ensure that all cables are routed away
from the boiler casing and hood.
Fig. 10e
N
From
Firefront
Fig. 10f
1.0 Introduction
Making the Electrical Connection
(continued) (50/5 model)
.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents