Replacement Of Oxy-Pilot Assembly; Replacement Of Control Unit (Edb); Wiring Diagram; Section Eleven - Infinity 600 CF Owner's Manual

Table of Contents

Advertisement

600 CF
Maintenance Instructions
SECTION TEN

REPLACEMENT OF OXY-PILOT ASSEMBLY

NOTE: If the pilot assembly is replaced it must be replaced by an identical unit from the same
manufacturer and replaced as a complete unit.
Follow the burner tray removal sequence.
 Undo the compression nut on the supply pipe at the pilot.
 Carefully pull off the ignition lead.
 Disconnect the thermocouple at the end of the main control valve.
 Remove the cross headed nut holding the pilot to the chassis
 Carefully remove the oxy-pilot.
 Re-assemble in reverse order.

REPLACEMENT OF CONTROL UNIT (EDB)

Remove the fixing screw from the EDB retaining bracket.
Pull the bracket plus EDB unit forward to clear the firebox.
 Disconnect leads from control unit and remove two bolts.
 Re-assemble in reverse order.
FLUE CHECK
 Remove the fire from the opening: - Reversing fitting instructions, but first remove Trim and glass
panel plus Log shapes.
 Examine flue and rectify as necessary.
 Replace the fire, referring to fitting instructions.

SECTION ELEVEN

Maintenance Continued

Wiring Diagram

19
LT5889 issue 7(10/12)

Advertisement

Table of Contents
loading

This manual is also suitable for:

890 cf

Table of Contents