Step 11 Start Icemaker - Monogram Built-in refrigerators Installation Instructions Manual

36” built-in all-refrigerators and all-freezers
Hide thumbs Also See for Built-in refrigerators:
Table of Contents

Advertisement

STEP 10 CONNECT WATER SUPPLY
(FREEZER MODELS ONLY)
House
Water Supply
about a quart of water through the tubing into a
bucket, then shut off the water.
Copper Tubing:
of the copper tubing. Insert the tube into the union
fitting on the unit and tighten the nut to the union.
GE SmartConnect
Tubing:
compression nut until it is just hand-tight.
NOTE: Make sure excess tubing length does not
interfere with the toekick installation.
Installation Instructions
Freezer
Water Supply

STEP 11 START ICEMAKER

Power
Switch
operation automatically.
arm.
STEP 12 INSTALL TOEKICK
the side of the refrigerator). Install the toekick
assembly with the 3 screws provided, adjust to the
desired height and tighten the screws.
supplied toekick as a template to cut the shape.
IMPORTANT:
refrigerator cabinet and the top of the toekick must
remain unobstructed for proper air circulation.
20
Icemaker
Feeler Arm

Advertisement

Table of Contents
loading

Table of Contents