Step 1, Remove Packaging; Step 2, Install Water Line; Step 3, Install Side Panels - Monogram Built-in refrigerators Installation Instructions Manual

36” built-in all-refrigerators and all-freezers
Hide thumbs Also See for Built-in refrigerators:
Table of Contents

Advertisement

STEP 1 REMOVE PACKAGING
CAUTION:
Product is much heavier
at the top than at the bottom – be careful when moving.
When using a hand truck, handle from side only.
PRUDENCE :
outer carton.
CAUTION:
PRUDENCE :
STEP 2 INSTALL WATER LINE
be between 40 and 120 p.s.i.
plastic tubing between house cold water line
and the water connection location.
of the unit. Allow enough tubing to accommodate bend
leading into the water line connection.
NOTE:
Do not use any other plastic water supply line because
the line is under pressure at all times. Other types
of plastic may crack or rupture with age and cause
water damage to your home.
2' (.6 m)
WX08X10002
6' (1.8 m) WX08X10006
15' (4.6 m) WX08X10015
25' (7.6 m) WX08X10025
STEP 3 INSTALL SIDE PANELS
Skip this step when not using side panels
be inserted into the case trim.
Installation Instructions
Le produit est beaucoup
from the base channels in the tie-downs.
bracket. Set aside for final installation.
brackets to the skid.
Shut off the main water supply.
of water.
valve and cold water pipe in a basement or cabinet.
The shut-off valve should be located where it will
be easily accessible.
Run about a quart of water through the tubing into
a bucket. Shut off water supply at the shut-off valve.
NOTE: Saddle type shut-off valves are included in many
water supply kits. Before purchasing, make sure a saddle
type valve complies with your local plumbing codes.
NOTE:
are illegal and use is not permitted in Massachusetts.
Fasten the panels to the unit with stick-on hook and
loop fastener strips before setting unit in place.
11
CAUTION:
PRUDENCE :

Advertisement

Table of Contents
loading

Table of Contents