Machine Installation; Manipulation And Unpacking; Space Requirements; Fastening The Machine - Primus 6kg Installation And Maintenance Manual

Professional washer extractors soap hopper on top panel
Table of Contents

Advertisement

4. MACHINE INSTALLATION

4.1. MANIPULATION AND UNPACKING

DURING TRANSPORTATION
All doors and passages the machine is to be transported through during installation must be reasonably
dimensioned to meet the width, height and depth off the machine including the package. The machine
dimensions are stated in chapter „3.Technical information".
UNPACKING
If possible, leave the machine in transporting package until the machine connection in the laundry.
The machine is screwed to the skid by two bolts M10x60, fig.4.1., pos.1. The placement of the bolts M10x60,
fig.4.1., pos.1 depends on machine model - (according to position of the transformer on the rear beam
of the frame). Remove the packaging and remove the rear panel, see fig.4.4. Remove the bolts M10x60,
fig.4.1., pos.1, by which the machine is screwed to the skid. Remove the plate of packaging fig.4.1., pos.2
by unscrewing the adjustable leg together with the nut M10. Mount the rear panel and the adjustable leg
together with the nut M10 back to the machine.
1. Bolt M10x60
2. Plate of packaging
ACCESSORIES DELIVERED WITH THE MACHINE
After unpaking check if all accessories have been delivered according to your order.

4.2. SPACE REQUIREMENTS

WORKING CONDITIONS OF THE MACHINE
The washer must not be installed or stored in an area where it will be exposed to water and/or weather.
Avoid damp conditions where water or moisture could run down the walls and covers of the washer or cover
the floor around the washer. Do not install the washer above an open gutter. Close any nearby gutters so
that waste water steam cannot collect near/inside the washer.
REQUIRED ROOM DIMENSIONS
Provided that the requirements in respect to room dimensions are not met, the maintenance of the fixed
or inbuilted machine may be difficult.
Leave at least a 0.6m / 24" free space between the rear panel of machine and the wall. Leave at least
0.04m / 1.6" free space between the side panel of the machine and the wall or other machine. Leave
at least 0,6m / 24" free space between the upper cover and the wall.

4.3. FASTENING THE MACHINE

The machine is too be located on a leveled floor which complies to static and dynamic stress of the
machine. Check the position of machine top by a water level and adjust machine legs (fig.3.1., pos.20).
516574_C_PUB_DATE_3_NOV_2009.DOC
Fig.4.1.Section view from the top of the machine
INSTALLATION AND MAINTENANCE MANUAL
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

7,5kg

Table of Contents