Bell and Howell Sidekick 1200 Operator Maintenance page 31

Hide thumbs Also See for Sidekick 1200:
Table of Contents

Advertisement

Push up the green levers at both ends in the direction of the arrows until they click into place.
6
After installing the paper feed roller module confirm that the feed rollers can be moved lightly in a vertical
direction.
7
Close the ADF door. When you close the ADF door, close it securely until the door is locked. Do not
slam the ADF door.
64

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sidekick 1400Sidekick 1400u

Table of Contents