Travis Industries 564 Installation Manual page 58

Built-in direct vent fireplace
Hide thumbs Also See for 564:
Table of Contents

Advertisement

5 8
Finalizing the Installation
7
Make the gas line connection, bleed the gas line (if applicable), start the heater and thoroughly leak-
test all gas connections and the gas control valve. Check the pilot. Adjust if necessary.
WARNING :
When lighting or re-lighting the pilot, the glass must be removed (see page 44).
To adjust the pilot flame, turn this screw (NOTE: if totally
unscrewed gas will come out of this port). Clockwise
lowers the flame while counter-clockwise raises it.
Travis Industries
(for qualified installers only)
The pilot flame must contact the thermocouple and
thermopile (see the illustration below). Adjust the pilot up or
down as necessary.
Standard
Screwdriver
4 0 7 0 6 2 0
100-01188_000

Advertisement

Table of Contents
loading

This manual is also suitable for:

564 space saver

Table of Contents