Glass Frame Assembly; Approved Venting; Combustion Air Venting Options; Air Duct Removal - kozy heat Chaska CSK-31 Installation Manual

Direct vent fireplace insert
Table of Contents

Advertisement

DO NOT OPERATE THIS FIREPLACE WITH GLASS REMOVED, CRACKED OR BROKEN. REPLACEMENT OF GLASS FRAME
ASSEMBLY, #CSK-057T SHOULD BE DONE BY A LICENSED OR QUALIFIED SERVICE PERSON.
WARNING
DO NOT REMOVE GLASS ASSEMBLY WHEN HOT!
REMOVE GLASS FRAME ASSEMBLY
A. Locate spring-loaded latches securing glass frame assembly at bottom of firebox.
B.
Pull bottom latches out and down to release glass frame assembly bottom.
C.
Lift glass frame assembly up off tabs located at top of firebox.
INSTALL GLASS FRAME ASSEMBLY
A. Align slots at top of glass frame assembly over tabs at top of firebox while
lowering bottom of glass frame assembly into position.
B.
Pull bottom latches out and up to secure glass frame assembly bottom.
ATTENTION
All steps as outlined in 'PREPARE EXISTING FIREPLACE' must be completed before continuing with this installation.

APPROVED VENTING

Kozy Heat #816-CL Co-Linear Vent System. Follow instructions on following pages.
ICC
Selkirk
American Metals
Simpson Dura-Vent
Follow instructions included from vent pipe manufacturer as well as venting requirements as outlined in this installation manual.

COMBUSTION AIR VENTING OPTIONS

OPTION 1: FULL CONNECTION: Combustion air intake pipe is run entire chimney length and connected to termination cap.
OPTION 2: STUB VENTING: Combustion air intake pipe is extended a minimum of 4 ft. (1.22 m) past damper opening into existing

AIR DUCT REMOVAL

Remove air duct at top of insert, sliding backwards out of channel.
Refer to instructions on following pages for vent system attachment to air duct.

GLASS FRAME ASSEMBLY

INSTALLATION
chimney. It is not connected to termination cap.
Figure 8a
8
Figure 8b

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents