5 .
M AI N T E N AN C E
This projector has been designed to provide years of optimum performance while requiring
only routine maintenance and cleaning. However,
periodic maintenance program of scheduled operational checks and preventive maintenance.
5.1.
G
E N E R AL
Use the program outlined in the schedule in
operating efficiency. Procedures for these operations are described in the referenced sections
of this manual.
Frequency
Daily
Daily
Bi-weekly
Annually
Figure 5-1: Schedule for Periodic Maintenance Operations
5.2.
V
I
I S U AL
1. Visually inspect projector for signs of excessive dust, dirt, physical damage, frayed or
damaged cables, and loose hardware.
2. Remove, replace, and repair as necessary.
3. Visually inspect inner, outer, and shutter timing belts. Replace belts that are frayed or show
signs of wear.
4. Check belt deflection (Sections
Ultramittent should be visually checked every 30 days. If leak is
detected, contact
Ultramittent. If leak is very slow, you may continue to operate
Ultramittent for 30 to 90 days.
CHRISTIE INCORPORATED P35GPS Projector
June, 1998
M
AI N TE N AN C E
Maintenance Operation
Visual inspection
Clean projector
Oil lateral guides and jewels
Replace belts and blow out belt dust
N S P E C TI O N
6.4.1,
6.4.2, and 6.4.3) and re-adjust if necessary.
CHRISTIE
CHRISTIE
CHRISTIE
CHRISTIE
CHRISTIE
strongly recommends a
Figure 5-1
to maximize projector life and
to arrange for loan of substitute
5
Section
5.2
5.3
5.3
5.4.2
5-1