Safety Instructions; Symbols; General Instructions; Modifications - Spare Parts - DeDietrich 310 ECO Series Installation And Operating Manual

Gas 310/610 eco series gas-fired condensing hot water boiler
Table of Contents

Advertisement

1

SAFETY INSTRUCTIONS

1.1 Symbols

The following symbols are used in this document to emphasize certain instructions. This is in order to
increase your personal safety and to safeguard the technical reliability of the boiler.
Instructions must be followed closely to avoid personal injury or serious damage to the unit or the
environment.
Important!!
Instructions are of essential importance for the correct functioning of the unit.

= Indicates danger of electrical shock. Serious personal injury may occur.
Read and familiarize yourself with these instructions:
Instructions contain useful information

General Instructions

Keep unauthorized personnel away from the boiler. Do not place objects on or against the boiler. Do not
touch hot water connections or the flue outlet when the boiler is operating – burn hazard.
Danger
This boiler is connected to a 120v power supply. An improper installation or attempts to repair electrical
components or controls may result in life threatening situations.
WHAT TO DO IF YOU SMELL GAS:
Do not smoke and make no fire or sparks;
Do not operate electrical switches
Do not use any phone in the building
Immediately call your gas supplier from another building. If the gas suppler is not available, call
9-1-1
Warning!
Follow the gas supplier's instructions.
Be aware of flue gas leaks
If you smell flue gas fumes, turn the boiler off and contact your service company or installer.
Beware of water leaks
If you see water leaking from the boiler, turn it off and contact your service company or installer.
Working on the boiler
Installation, commissioning, maintenance and repair work must only be carried out by a licensed and
qualified technician. Designed and engineered in accordance with all relevant national/local standards
and certifications.
Always disconnect the main power supply and close the main gas cock before working on the boiler.
Casing panels should only be removed for maintenance and servicing purposes. Refit all panels on
completion of maintenance or servicing before putting the boiler back into service.
Instructions and warning labels on the boiler must never be removed or covered and must be clearly
legible throughout the entire service life of the boiler. Damaged or illegible instructions and warning labels
must be replaced immediately.
Generally applicable safety instructions related to accident prevention must be consulted in addition to the
information supplied in this technical documentation.
Boiler modification and spare parts
De Dietrich Gas 310/610 ECO
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents