Operational Checks

GENERAL
Manitowoc ice machines are factory-operated and
adjusted before shipment. Normally, new installations do
not require any adjustment.
To ensure proper operation, always follow the
Operational Checks:
when starting the ice machine for the first time
after a prolonged out of service period
after cleaning and sanitizing
NOTE: Routine adjustments and maintenance
procedures are not covered by the warranty.
Important
Scroll
refrigeration
operated for a minimum break in period of 24
hours before full ice production will be reached.
Part Number 000006520 11/11
compressors
must
ICE THICKNESS CHECK
After a harvest cycle, inspect the ice cubes in the ice
storage bin. The ice thickness probe is factory-set to
maintain the ice bridge thickness at 1/8" (3 mm).
NOTE: Make sure the water curtain is in place when
performing this check. It prevents water from splashing
out of the water trough.
1. Inspect the bridge connecting the cubes. It should
be about 1/8" (3 mm) thick.
2. If adjustment is necessary, turn the ice thickness
probe adjustment screw clockwise to increase
bridge thickness, counterclockwise to decrease
bridge thickness. Set at 1/4" (6 mm) gap between
ice machine and evaporator as starting point, then
adjust to achieve a 1/8" (3 mm) bridge thickness.
NOTE: Turning the adjustment 1/3 of a turn will change
the ice thickness about 1/16" (1.5 mm).
be
1/8" (3 mm)
ICE BRIDGE THICKNESS
3. Make sure the ice thickness probe wire and the
bracket do not restrict movement of the probe.