Pcb Removal And Replacement; Figure 5-5 Removing The Pcb Cover - KVH Industries TracVision S3 Owner's Manual

Tracvision s3
Hide thumbs Also See for TracVision S3:
Table of Contents

Advertisement

5.4.1 PCB Removal and Replacement

Estimated Time to Repair:
The microprocessor PCB assembly is protected by a cover
fastened to the rotating plate – Fig. 5-1. The cover must be
removed to gain access to the main power fuse and the PCB
assembly.
1. Using needle-nose pliers, remove the E-ring from
one end of the connecting rod – Fig. 5-2.
2. Remove the connecting rod by sliding it off the
bracket.
3. Fully retract the elevation axis motor shaft
– Fig. 5-5.
Elevation Axis
Motor Shaft
Linear Actuator
4. Remove 6 pan head screws from the PCB cover
flanges.
5. Remove the PCB cover. To get the necessary
clearance, rotate the linear actuator up 90º while
lifting the PCB cover – Fig. 5-5.
6. Remove cable connectors from PCB. Figure 5-6 on
the following page illustrates the PCB
arrangement and connector locations.
54-0182 Rev. A1
1
hour
2
PCB Cover
Maintenance
When carrying out maintenance
on the PCB, be sure to not drop
any of the small screws inside the
mechanism. If a screw is lost within
the baseplate, it must be retrieved
to avoid causing any damage when
the unit rotates.
Figure 5-5
Removing the PCB Cover
TracVision S3 is equipped with a
5x20 mm, 3.15-amp, 250 volt fast-
blow fuse, which is mounted on the
PCB. To access and replace the
fuse, remove the PCB cover.
5-5

Advertisement

Table of Contents
loading

Table of Contents