2.3.4 Connecting the IRD Ground Wire

A grounding wire (Cable #32-0583-50) has been provided to
connect your IRD to a suitable ground and protect the system.
Attach the grounding wire to any suitable screw on the rear
panel of the IRD with a good contact with the IRD chassis. The
other end should be connected to a suitable ground, ideally the
ground connector on the switchplate (see Figure 2-21).

2.3.5 Installing the Switchplate

After completing the switchplate wiring process, you must install
the switchplate itself. This process, detailed in the following
steps, is illustrated in Figure 2-22.
1. Fit the switchplate assembly and support frame
into the panel cutout made in Step 2 in
and flush to the mounting surface.
2. Drill out four
5
settings in the switchplate support frame.
3. Drill four
" (2 mm) holes in the mounting surface
3
3 2
using the countersunk holes in the support frame
as the template. Secure the support frame and
switchplate assembly to the mounting surface
using the four #6 self-cutting screws.
4. Snap the front cover into place to cover the screws
and support frame.
A. Panel Cutout
3.82"
(97 mm)
2.36"
(60 mm) 2.05"
(52 mm)
54-0182 Rev. A1
" (4 mm) holes in the countersunk
3 2
B. Support Frame
3.19"
(81 mm)
Section 2.3
C. Front Cover
5
/
" (2.5 mm)
3
32
Before securing the switchplate to
the mounting surface, be sure to
strain relieve the wires connected
to the switchplate connectors.
Several tie-wraps have been
provided to aid in strain relieving
the wires.
Figure 2-22
Mounting the Switchplate
Support Frame and Front Cover
/
" (4 mm)
32
Installation