Connect To The Gas Supply; Before Leaving The Installation; Commissioning - Belling FSDF 60 DO Service Manual

Freestanding dual fuel au oven
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS - DUAL FUEL PRODUCTS

Connect to the gas supply

The inlet to the cooker is ½" BSP internal
situated at the rear right corner. Fit the
bayonet connection. This should be
located so as to ensure that the flexible
connector hose does not kink.
Under no circumstances should the flexible
connector be allowed to come into contact with
the vertical oven flue tubes on the rear of the
appliance.
Use a 900mm - 1125mm length of
flexible connector.
Ensure that all pipework is of the correct
rating for both size and temperature.
Natural Gas - Flexible connections should
comply with BS 669. Parts of the appliance
likely to come into contact with a flexible
connector have a temperature rise of less
than 70°C.
After installation, make sure all connections
are gas sound.

Commissioning

Burner aeration
All burners have fixed aeration and no
adjustment is possible.
Pressure setting
Natural Gas @ 1.00kPa
Hob burner - Turn the control knob to the
FULL ON position, wait a second before
pressing the ignition switch or holding a
lighted match or taper to the burner. Hold
the control knob in for 15 seconds. Do not
hold the control knob in for longer that 15
seconds. If the burner fails to light within
this time, release the control knob and
wait one minute before attempting further
ignition.

Before leaving the installation

1. Place all the loose parts of the cooker
into position.
2. Show the customer how to operate
the cooker and give them this handbook.
Thank you.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents