Stacking Combitherm Connections - Alto-Shaam 6-10ML Service Maintenance Manual

Gas ml series combination oven/steamer
Hide thumbs Also See for 6-10ML:
Table of Contents

Advertisement

C O M B I T H E R M

1.22 STACKING COMBITHERM CONNECTIONS

Stacking Combitherm requirements:
• Two (2) water supply connections
• Two (2) water drain connections
• Two (2) gas connections
1"
(25,4mm)
UNION
Intake
1" (25,4mm)
UNION
1"
(25,4mm)
UNION
Intake
1" (25,4mm)
UNION
. 1 2
P G
3/4"
(19mm)
GAS
3/4"
(19mm)
WATER
C O M B I T H E R M G A S I N S TA L L AT I O N A N D M A I N T E N A N C E M A N UA L
G A S I N S TA L L AT I O N
®
I F L O C A L C O D E A L L OW S , the gas, water,
and drain may be manifolded as long as the
size of the water inlet is increased to 1-inch
(25,4mm) and the drains include an external
vent. The drawing illustrates one suggested
method of a manifold installation.
N OT E : To aid in water drain installation,
your shipment includes
two (2) Water Drain Tubes, DA-26315 and
two (2) Water Drain Nuts, DA-26316.
1-1/4"
(32mm)
DRAIN
DA-26316
— 6 4 7 0
M L
DA-26315

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7-14ml10-20ml12-18ml20-20ml10-10ml

Table of Contents