Inspection/Shipping
Initial Inspection
WARNING
16 General Information
This section describes initial (incoming) inspection and shipping guidelines
for the AFG.
Use the steps in Figure 1-2 as guidelines to perform initial inspection of the
AFG.
To avoid possible hazardous electrical shock, do not perform
electrical tests if there are signs of shipping damage to the
shipping container or to the instrument.
Figure 1-2. Initial (Incoming) Inspection Guidelines
Chapter 1