Download Print this page

Smoke hollow 7000CGS Assembly & Operation page 10

Grill & smoker

Advertisement

Assembly
Step 6
Grill Lid
Fig. 6
Step 7
Fig. 7B
Step 6: Attach Long Handles to Gas and
Charcoal Grill Lids
Locate: (4) Handle Stand-offs, (2) Long Lid
Handle Tubes, (8) M6x8 bolts.
Procedure:
Open the grill lids and place the handle stand-
offs over the holes in each end of the lids.
Then insert an M6x8 bolt through each hole.
Step 7: Attach the Smoke Stack
Locate: Smoke Stack Assembly, (4) M6x15
bolts and (4) M6 KEPS nuts.
Fig. 7A
Procedure:
Remove smoke stack lid as shown in Figure 7A.
Then insert smoke stack through grill lid from the
inside as shown in Figure 7B. Attach smoke
stack to the lid. M6x15 bolts will be inserted
through the lid from the outside and the M6
KEPS nuts will be positioned on the inside as
shown in Figure 7C. Then replace smoke stack
lid.
Fig. 7C
10

Hide quick links:

Advertisement

loading