This shows an attic
installation.
1. Keep insulation away
from the vent pipe at
least 1 inch (25 mm).
If the area above the ceiling IS an attic, position and
secure the firestop on top of the previously framed
hole.
CEILING
CEILING FIRESTOP
Figure 26. Attic Firestop
C. Vent Termination
For Horizontal Terminations - To attach and
secure the termination to the last section of
horizontal vent:
• Rotate and interlock the ends as described at the
beginning of the Installing Vent Components
section.
• The termination kit should pass through the wall
firestops from the exterior of the building.
• Adjust the termination cap to its final exterior
position on the building.
WARNING
THE TERMINATION CAP MUST BE
POSITIONED SO THAT THE ARROW IS
POINTING UP.
For roundcap termination kits:
• Use the exterior pipelock hole provided on the
round flange of the wall firestop to secure the
vent pipe in place.
For trapezoidal cap termination kits:
• Using screws, secure the cap to the exterior wall
through the flanges built into the cap.
• Use a high-temperature sealant or fiberglass
rope gasket to seal between the vent pipe and
exterior firestop.