Task 7: Initiating The Element Manager - IBM SAN04M-R Installation And Service Manual

Totalstorage san router
Table of Contents

Advertisement

Task 7: Initiating the Element Manager

subnet mask = subnet mask of the management port (optional)
4. Set a permanent route to the network management station.
• At the command prompt enter:
set mgmt permroute <addr><mask><gateway>
where:
address = IP address of the network management subnet. This IP
address is used to add a static route to the SAN Router's route
table. This is required by the management station if it's on a
different subnet than the 10/100 interface.
mask = subnet mask of the network management subnet.
gateway = IP address of the gateway router. The gateway router
is a directly connected router to which management traffic should
be forwarded.
5. Save the configuration using the CLI:
• At the command prompt enter:
save
6. Reset the system using the CLI:
• At the command prompt enter:
reset system
The management IP address is now set and ready for normal
out-of-band management. If you choose to continue configuring the
SAN Router using CLI, please see the E/OSi Command Line Interface for
IBM TotalStorage User Manual.
1. Connect the standard RJ45 Cat 5 Ethernet cable from the LAN to
the 10/100 management port (RJ45). See
• Wait for the SAN Router link LEDs to light.
NOTE: The link LEDs are located in the upper left and upper right corners of
the RJ45 connector. Only one LED will illuminate at a time, the left LED for 10
Mbps and the right LED for 100 Mbps. A steady light means a link was
detected and a blinking light means there is traffic.
Chapter 2: Installing and connecting the SAN Router
Figure 4
on page 23.
21

Advertisement

Table of Contents
loading

Table of Contents