How To Load Chart Permits - Furuno FEA-2100 Operator's Manual

Electronic chart display and information system
Hide thumbs Also See for FEA-2100:
Table of Contents

Advertisement

How to load chart permits

Permits are usually delivered in floppy disk. To load chart permit into the system, proceed as follows:
Enter Manual button:
This function enables enter manually permit string which is delivered for example by telex. After typing the string
user can accept it by pressing Add button or reject by Cancel button.
Backup button:
This button opens "Save As" dialog. User is able to make backup copy from Chart Permit file.
158 • • • • Raster Chart material
1.
From the Control panel press Chart Plan push button.
2.
From menu check that there is a following text in first line: Activate S57
chart. If it is, then go to step 4.
3.
If there is text Activate ARCS chart choose this command.
4.
Select Permits command from the menu. There will appear Permit
Management Window.
5.
Insert a permit floppy disk to floppy disk drive.
6.
Press Load file button.
7.
Select file and press Open.
8.
Check in Permit Management that permits are displayed here
9.
Close window, press CANCEL in ECDIS Control Panel

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fea-2105

Table of Contents