Checking The Condensate Siphon; Checking The Ignition Electrode; Checking The Combustion - REMEHA Avanta 24c Installation And Service Manual

High-efficiency wall-hung boilers
Hide thumbs Also See for Avanta 24c:
Table of Contents

Advertisement

Remeha Avanta Plus
fig. 53
Checking siphon
T001775
fig. 54

Checking the ignition electrode

112952.LT.GB.W7H.056
fig. 55

Checking the combustion

112952.LT.GB.W7H.057
127768-271011
T001775-A
3 à 4 mm
>1 min
112952LTGBW7H056a
112952LTGBW7H057a
3.1.3

Checking the condensate siphon

• C heck the condensate siphon. Remove any dirt residues
and refill with clean water to the mark.
3.1.4
Checking the ignition electrode
• Check the ionisation /ignition electrode for:
- D eposits (remove any white deposits with abrasive cloth);
- T he adjustment of the ignition electrode (between 3 and 4
mm);
- The quality of the gasket and condition of the porcelain
(this should not be cracked) inspect and replace if neces-
sary;
• C heck the ionisation current after 1 minute on the display
code fl, see par. 2.9.6.
If the read-out value is lower than 3 or higher than 9µA, check
cable and connections are sound if OK replace the ignition
electrode.
The ignition cap is fixed on the ignition electrode and therefore
cannot be removed.
3.1.5
Checking the combustion
• M easure the O
/CO
percentage and the flue gas tempera-
2
2
ture at the flue gas sample point.
Do this as follows:
- Heat the water temperature in the boiler to approx. 70°C;
- Unscrew the top of the flue gas point of measurement;
- Measure the O
/CO
percentage and compare this to the
2
2
check values in table 11.
Ensure that the analysing probe has a gas tight seal in the
sampling point with the probe end in the centre of the flue
duct.
3. Inspection and maintenance
45