Installation; Scope Of Delivery; Mounting The Boiler; Clearance Requirements - REMEHA Avanta 24c Installation And Service Manual

High-efficiency wall-hung boilers
Hide thumbs Also See for Avanta 24c:
Table of Contents

Advertisement

Remeha Avanta Plus

2 INSTALLATION

fig. 03

Scope of delivery

112952.LT.GB.W7H.011
Instructie service
AvantaPlus
fig. 04

Clearance requirements

112952.LT.GB.W7H.003
127768-271011
3x
3x
3x
112952LTGBW7H011b
4 0
0
m i
n .
2 5
0
6 7
0
m i
n .
2 5
0
0
3 0
0 0
n . 6
m i
112952LTGBW7H003a
2.1
Scope of delivery
The standard delivery of the Remeha Avanta Plus boiler
includes:
- The boiler (including pressure gauge and safety valve);
- Mounting plate (including isolation valve set and washers);
- Nylon plugs and screws for fixing mounting plate;
- Copper tails 15/22 mm;
- Mounting template;
- Filling loop;
- Warranty Leaflet (The terms and conditions of the warranty
are included in the warranty leaflet, on installation of the
boiler please fill in the registration card and return to
Remeha);
- Installation and Service manual and Users guide.
This Installation and Service manual deals with the standard
supplied boiler only. For the installation or assembly of any
optional accessories supplied with the boiler, such as stand off
frame, pipework kits, cover plate, control kits, etc, please refer
to the Assembly Instructions supplied with these accessories.
2.2

Mounting the boiler

Packed in the box with the Remeha Avanta Plus box is
this Installation and Service manual. Read instructions and
remarks carefully. This section includes the guidelines and
instructions for the connection of gas, water, electricity, safety
devices, the regulator, control unit, flue discharge and air sup-
ply.
2.2.1
Clearance requirements
The gas and water connections are located on the bottom of
the boiler whilst the air in and flue gas outlet is located on the
top of the boiler. The boiler is supplied as standard with pipe-
work tails to allow connections facing downwards.
Optional stand off frame and pipework kits are available
to enable the pipework to run upwards behind the boiler if
required. For installation, servicing and inspection min. 600
mm in front of the boiler is required. If this free space is
obtained by opening a door or removing a panel, the boiler
may be installed for instance in a closed cupboard.
For ease of installation we recommend clearances of 0.5 cm
at the side so that the unit is easy to open, with a free space
of 25 cm under the appliance and 25 cm above the appliance,
as the minimum requirement.
However once installed, it is possible to reduce these clear-
ances to 22 cm at the top, and 5 cm at the bottom provided
the boiler front panel can be removed and the isolating valves
are easily accessible without the use of tools"
2. Installation
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents