3. Inspection and maintenance
fig. 51
Checking the water pressure
T001929-A.pdf
fig. 52
Checking flue pipes
112952.LT.GB.W7H.055
44
Min. 1 bar
3.1.1
The water pressure should be checked against the commission-
ing entry located on the inside back of this document (min 1 bar).
• I f necessary, re-fill system to design pressure and re-set red
pointer to match fill pressure.
Check system for leaks if the system needs re-filling more
than 3 times per year.
T001930-A
3.1.2
• C heck that the flue and air-supply connections and pipes
are sealed and the terminal exit is clear.
112952LTGBW7H055a
Checking the water pressure
Checking the flue pipes and air supply pipes for
leaks
Remeha Avanta Plus
127768-271011