Cleaning The Siphon; Checking The Burner And Cleaning The Heat Exchanger - REMEHA Quinta Ace 30 Service Manual

High-efficiency wall-hung gas boiler
Hide thumbs Also See for Quinta Ace 30:
Table of Contents

Advertisement

7 Maintenance
7.4.5

Cleaning the siphon

Fig.43
Cleaning the siphon
2
1
7.4.6

Checking the burner and cleaning the heat exchanger

Fig.44
Disconnecting the fan
3
42
Tab.50
Values at part load for G31 (propane)
Quinta Ace 30
Quinta Ace 45
Quinta Ace 55
Quinta Ace 65
Quinta Ace 90
Quinta Ace 115
(1) Nominal value
(2) These values are only applicable when the fan speeds have been set
1. Dismantle the siphon and clean it.
2. Fill the siphon up with water.
3. Fit the siphon.
3
AD-0000086-01
1. Disconnect the two fan plugs on the front and rear.
2. Remove the screwed-on plug from the gas control valve.
1
3. Remove the ignition electrode plug from the ignition transformer.
2
AD-3001178-02
Checking/setting values for O
G31 (propane)
for BREEAM.
Caution
The O
values at part load must be higher than the O
2
full load.
Danger
The siphon must always be sufficiently filled with water. This
prevents flue gases from entering the room.
at part load for BREEAM with
2
O
(%)
(1)(2)
2
6,7
- 7,2
(1)
7,1
- 7,6
(1)
6,7
- 7,2
(1)
6,9
- 7,2
(1)
7,4
- 7,7
(1)
6,9
- 7,4
(1)
values at
2
7703943 - v.06 - 13122021

Advertisement

Table of Contents
loading

Table of Contents