Enerzone Solution 2.5-ZC Installation And Operation Manual page 85

Us environmental protection agency phase ii certified wood fireplace
Hide thumbs Also See for Solution 2.5-ZC:
Table of Contents

Advertisement

Note that secondary air tubes can be replaced without removing the baffle board.
Solution 2.5-ZC Fireplace Installation and Operation Manual
2. Align the notch in the left
end of the tube with the
tab of the left air channel
hole.
3. Insert a cotter pin in the
last hole on the right side
of the tube. Then bend the
tabs on the pin to keep in
place.
4. Repeat steps 1, 2 and 3
for the two tubes in the
back then install the baffle.
Then, install the two front
tubes.
5. To remove the tubes use
the above steps in reverse
order.
85

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solution 2.5-zc eb00016

Table of Contents