Installing Cascade Clock Cables; Figure 2-4 Zxr10 T8000 Control Plane Cascade Connections Of Cluster 1+4 - Zte ZXR10 T8000 Hardware Installation Manual

Carrier-class router
Hide thumbs Also See for ZXR10 T8000:
Table of Contents

Advertisement

2. Through the 10GE optical interfaces of the CESU, interconnect the two thick lines as
shown in
3. Stick labels on both sides of the fiber to describe the information about the fiber.
4. Use cable straps to organize and bind the fibers in compliance with related
specifications.

Figure 2-4 ZXR10 T8000 Control Plane Cascade Connections of Cluster 1+4

2.2.3 Installing Cascade Clock Cables

The connections of the cascade clock cables among multiple devices in the ZXR10 T8000
cluster 1+4 system are as shown in
SJ-20110901170352-005|2011-10-15 (R2.0)
Figure
2-4, so as to realize high speed data switching and load sharing.
Chapter 2 Installation of Cluster in 1+4 Mode
Figure
2-5.
2-5
ZTE Proprietary and Confidential