Sign In
Upload
Manuals
Brands
Zte Manuals
Network Router
ZXR10 T8000 Series
Zte ZXR10 T8000 Series Manuals
Manuals and User Guides for Zte ZXR10 T8000 Series. We have
2
Zte ZXR10 T8000 Series manuals available for free PDF download: Hardware Installation Manual, Manual
Zte ZXR10 T8000 Series Hardware Installation Manual (61 pages)
Carrier-Class Router
Brand:
Zte
| Category:
Network Router
| Size: 7.39 MB
Table of Contents
Table of Contents
3
Chapter 4 Installing Signal Cables
5
About this Manual
5
Chapter 1 Introduction to Cluster
7
Overview of Cluster
7
Hardware Composition of Cluster
8
Figure 1-1 ZXR10 T8000 Central Switching Shelf and Line Card Shelf
9
Figure 1-2 Slot Allocation Within a Central Switching Shelf and Line Card Shelf
10
Figure 1-3 Overall Cascade Connections of ZXR10 T8000 Cluster 1+4
10
Physical Parameters of Cluster
11
Figure 1-4 Overall Cascade Connections of ZXR10 T8000 Cluster 2+8
11
Table 1-1 Physical Parameters of a Line Card Shelf of the ZXR10 T8000 Cluster System
11
Table 1-2 Physical Parameters of a Central Switching Shelf of the ZXR10 T8000 Cluster System
13
Cluster Installation Flow
14
Figure 1-5 ZXR10 T8000 Cluster Installation Flow
15
Installation Preparations
17
Installation of Cascade Connection Cables
17
Chapter 2 Installation of Cluster in 1+4 Mode
17
Installing Cascade Data Cables
17
Figure 2-1 ZXR10 T8000 Data Plane Cascade Connections of Cluster 1+4
18
Figure 2-2 Data Plane Cascade Fibers
19
Installing Cascade Control Cables
20
Figure 2-3 some Rows of Fibers Connected in the Cluster Installation
20
Installing Cascade Clock Cables
21
Figure 2-4 ZXR10 T8000 Control Plane Cascade Connections of Cluster 1+4
21
Figure 2-5 Cascade Clock Cables Among Multiple Devices
22
Installation Preparations
23
Installation of Cascade Connection Cables
23
Chapter 3 Installation of Cluster in 2+8 Mode
23
Installing Cascade Data Cables
23
Figure 3-1 ZXR10 T8000 Data Plane Cascade Connections of Cluster 2+8
24
Installing Cascade Control Cables
25
Installing Cascade Clock Cables
26
Figure 3-2 ZXR10 T8000 Control Plane Cascade Connections of Cluster 2+8
26
Chapter 4 Installing Signal Cables
29
Chapter 5 Equipment Power-On and Power-Off
31
Check before Power-On
31
Checking Equipment Installation
31
Table 5-1 Equipment Installation Check List
31
Power Cable and Grounding Check
33
Cable Installation Check
33
Table 5-2 Power Cable and Equipment Grounding Check List
33
Table 5-3 Cable Installation Check List
33
Equipment Power-On
34
Check after Equipment Power-On
34
Equipment Power-Off
34
Table 5-4 Check List after Equipment Power-On
34
Appendix A Equipment Operation Environment Requirements
37
Equipment Room Building
37
Table A-1 Equipment Room Building Requirements
37
Temperature, Humidity and Altitude
38
Equipment Room Cleanliness
38
Table A-2 Temperature, Humidity and Altitude Requirements
38
Anti-Poisonous Gas
39
Table A-3 Equipment Room Cleanliness Requirements
39
Table A-4 Anti-Poisonous Gas Requirements
39
ESD Antistatic Safety
40
Electromagnetic Environment
41
Lightning Protection Ground
42
Table A-5 Lightning Protection Requirements of Equipment Room Power
42
Table A-6 Lightning Protection Requirements of Equipment Room Communication Interface
42
Appendix B Label Specification
43
Label Specification Introduction
43
Label Making Requirements
43
Label Paste Precautions
43
Equipment Labels
44
Knife-Shaped Label
44
Label Shape and Paste Position
44
Electrical Cable Label
45
Figure B-1 Knife-Shaped Label Dimension and Paste Position
45
Table B-1 ZTE Equipment Electrical Interface ID Format
45
Table B-2 DDF Cable Interface ID Format
46
Power Cable Label
47
Figure B-2 Knife-Shaped Electrical Cable Label Example
47
Table B-3 ZTE Equipment Side Power Port ID Format
47
Fiber Cable
48
Figure B-3 Knife-Shaped Power Cable Label Example
48
Table B-4 User Equipment Side Power Port ID Format
48
Table B-5 Fiber Pigtail Interface ID Forma
49
Table B-6 ODF Fiber Pigtail Interface ID Format
49
Ethernet Cable Engineering Label
50
Rectangular Label
50
Horizontal English Label for Panel or Plug
50
Figure B-4 Knife-Shaped Fiber Pigtail Label Example
50
Figure B-5 Horizontal English Label for Panel or Plug
50
Laser Print Wrapping Label (Type II
51
Label Pasted on Cable
51
Figure B-6 Laser Print Wrapping Label (Type II
51
Figure B-7 Power Cable Label
51
Figure B-8 Power Cable Label Paste Position
52
Figure B-9 Fiber Cable Engineering Label
52
Figure B-10 Fiber Cable Engineering Label Content
53
Figure B-11 Coaxial Cable Engineering Label
53
Figure B-12 Coaxial Cable Engineering Label Content
54
Figure B-13 Horizontal English Label (Type I
54
Cable Length Label
55
Label Check
55
Figure B-14 Ethernet Cable Label Content
55
Figure B-15 Cable Length Label Dimension and Content
55
Table B-7 Label Check Items
55
Figures
57
Tables
59
Glossary
61
Advertisement
Zte ZXR10 T8000 Series Manual (57 pages)
Routers and Switches Running the ZXROSNG Operating System
Brand:
Zte
| Category:
Network Router
| Size: 0.83 MB
Table of Contents
Table of Contents
3
Chapter 1 ST INTRODUCTION
5
St Identification
5
Common Criteria for Information Technology Security Evaluation – Part
5
References
5
ST Title
5
Toe Identification
6
Table 1-1 M6000&T8000&8900E Series Models
6
Toe Overview
8
Intended Usage and Security Features of the TOE
8
Non-TOE Components
8
Toe Description
9
Physical Scope
10
Logical Scope
11
Evaluated Configuration
12
Table 1-2 Evaluated Configuration
12
Chapter 2 CONFORMANCE CLAIMS
15
Common Criteria (CC) Conformance
15
Chapter 3 SECURITY PROBLEM DEFINITION
17
Threat
17
Table 3-1 Threat
17
Assumption
18
Personnel Assumptions
18
Physical Environment Assumptions
18
Table 3-2 Personnel Assumption
18
Table 3-3 Physical Assumption
18
Operational Assumptions
19
Organizational Security Policies
19
Table 3-4 Operational Assumption
19
Table 3-5 Organizational Security Policy
19
Chapter 4 SECURITY OBJECTIVES
21
Security Objectives for the Toe
21
Table 4-1 Security Objective
21
Security Objectives for the Environment
22
Table 4-2 Security Objective for the Environment
22
Chapter 5 SECURITY REQUIREMENTS
23
Security Functional Requirements
23
Overview
23
Table 5-1 TOE Security Functional Requirements
23
Table of Contents
24
Fau_Gen.2
26
Fau_Sar.1
26
Fau_Stg.1
26
Fau_Stg.4
26
Fdp_Ifc.1
26
Fdp_Iff.1
27
Fdp_Ifc.1
28
Fdp_Iff.1
28
Fdp_Uit.1
29
Fia_Afl.1
29
Fia_Sos.1
29
Fia_Uau.2
30
Fia_Uau.5
30
Fia_Uid.2
30
Fmt_Mof.1
30
Fmt_Msa.1
30
Fmt_Msa.3
30
Fmt_Mtd.1
31
Fmt_Smf.1
31
Fmt_Smr.1
31
Fpt_Stm.1
32
Fta_Ssl.3
32
Fta_Tse.1
32
Ftp_Itc.1
32
Ftp_Itc.1
33
Table 5-2 Security Assurance Requirements (EAL3+)
33
Chapter 6 TOE SUMMARY SPECIFICATION
35
Toe Security Functions
35
Security Auditing
35
Identification & Authentication
37
Security Management
38
TOE Access
41
User Data Protection
41
Trusted Channel
43
Table 7-1 Mapping of Security Objectives to Threats/Osp
45
Chapter 7 RATIONALE
45
Rationale for Security Objectives
45
Rationale for Security Objectives for the Environment
45
Rationale for Security Objectives for the TOE
45
Table 7-2 Mapping of Assumptions to Security Objectives for the Operational Environment
46
Table 7-3 Mapping of Security Functional Requirements to TOE Security Objectives
46
Security Requirements Rationale
46
Rationale for TOE Security Functional Requirements
46
Table 7-4 Mapping of the Rationale of TOE Security Requirements to Objectives
47
Rationale for Security Assurance Requirements
50
Table 7-5 Security Functional Requirement Dependencies
50
Table A-1 Document Terminology
53
Appendix A Document Terminology
53
Advertisement
Related Products
Zte ZXR10 T600
Zte ZXR10 T1200
Zte ZXR10 2600
Zte ZXR10 3800-8
Zte ZXR10 ZSR
Zte ZXR10 GER
Zte ZXR10 1800-2S
Zte ZXR10 2800-4
Zte ZXR10 2800-3E
Zte ZXR10 1800-2E
Zte Categories
Cell Phone
Modem
Wireless Router
Network Router
Switch
More Zte Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL