Zte ZXR10 T8000 Hardware Installation Manual page 27

Carrier-class router
Hide thumbs Also See for ZXR10 T8000:
Table of Contents

Advertisement

Chapter 3 Installation of Cluster in 2+8 Mode
shelf (LCC) or central switching shelf (CFC) be connected, so that the cascaded LCCs
and CFCs have a unified clock.
If multiple clock references are available, refer to
Figure 3-3
to connect the cascade clock
cables.
Figure 3-3 Clock Cable Cascading of ZXR10 T8000 Cluster 2+8 — Mode 1
If multiple clock references are not available, refer to
Figure 3-4
to connect the cascade
clock cables.
3-5
SJ-20110901170352-005|2011-10-15 (R2.0)
ZTE Proprietary and Confidential

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents