Chapter 5 Equipment Power-On And Power-Off; Check Before Power-On; Checking Equipment Installation; Table 5-1 Equipment Installation Check List - Zte ZXR10 T8000 Hardware Installation Manual

Carrier-class router
Hide thumbs Also See for ZXR10 T8000:
Table of Contents

Advertisement

Chapter 5
Equipment Power-On and
Power-Off
Table of Contents

Check Before Power-On.............................................................................................5-1

Equipment Power-On .................................................................................................5-4
Check After Equipment Power-On..............................................................................5-4
Equipment Power-Off .................................................................................................5-4
5.1 Check Before Power-On

5.1.1 Checking Equipment Installation

To avoid system fault or failure caused by installation mistake, it is necessary to check the
equipment installation before powering on the equipment.
Caution!
The switches of all power distribution boards and shelves should be OFF during equipment
installation check.
Check equipment installation by the items described in

Table 5-1 Equipment Installation Check List

No.
Check Items
1
Whether the equipment positioning meets the dimension requirements
on the design drawing
2
Whether the expansion bolt used to fix the cabinet or base (bracket) to
the ground is securely installed;
Whether there exist flat washer and spring washer;
Whether the spring washer is on the flat washer
SJ-20110901170352-005|2011-10-15 (R2.0)
Table
5-1
ZTE Proprietary and Confidential
5-1.
Checking Method
The check is based on the
engineering design document
On-site check