4.6

UNPACKING

Move the equipment in it's original packing, carton box or wooden case, until the place of installation
and remove the packing and the transport sockets only just before installing the UPS.
1
2
3
4
LP 33 Series unpacking sequence
Fig. 4.6-1
Modifications reserved
OPM_LPS_33E_10K_30K_4GB_V030.doc
Procedure for the unpacking of the UPS:
• Make sure to have sufficient space around the UPS
before you start unpacking.
• Cut the two straps "A" fixing the carton box.
• Remove the wooden top cover "B", which will be
used as a ramp and position it as shown in the
picture.
• Remove the protection "C" outside the cabinet and
the accessories bag.
• Remove the carton box "D".
• Remove the 2 angle irons "E", which are fixing the
UPS to the wooden base "G" by unscrewing bolts "F".
• Push now the UPS towards the ramp "B" and let it
slide down the ramp.
This has to done with the utmost care!
NOTE !
Be aware of the heavy weight of the
UPS, in particular if already equipped
with Batteries.
Page 25/85
Operating Manual LP 33 Series / 10-20-30 kVA