UNPACKING

The UPS and battery cabinets may be shipped packaged in carton boxes or in wooden
crates (if requested).
Move the cabinets as close as possible to the final location before removing from the pallet.
Remove the cabinet from the pallet with care because of the heavy weight of the equipment.
To unpack the cabinet follow the instructions below:
WOODEN CRATE WILL ARRIVE
1.
AS SHOWN.
3.
Let down the ramp "A" and save
wood braces "B and C" for ramp
supports.
B
C
A
5.
Unscrew anchoring bolt "D" from
plate on all four legs.
D
OPM_SGS_ISG_10K_40K_0US_V010.doc
A
17/45
REMOVE FRONT AND TOP
2.
PANELS.
4.
Remove the remaining panels.
6.
Loosen leveling foot.
Installation Guide SG Series 10, 20, 30 & 40 kVA