4.6

UNPACKING

Move the equipment in it's original packing, carton box or wooden case, until the place of installation
and remove the packing and the transport sockets only just before installing the UPS.
1
2
3
E
Fig. 4.6-1 LP33 Series 20 & 30 unpacking sequence
Included in the delivery you can find the following parts:
Control Bus cables (only for RPA Parallel System)
CD-ROM connectivity
An accessories bag
NOTE !
The wheels are designed only for limited movements on the installation site.
Modifications reserved
GE_UPS_ISG_LPS_3UL_20K_30K_2US_V010.docx
Critical Power
B
C
D
E
E
Procedure for the unpacking of the UPS:
 Make sure to have sufficient space
around the UPS before you start
unpacking.
 Cut the two straps "A" fixing the
carton box.
 Remove package "B and C".
 Remove the protection "D" outside
the cabinet and the accessories bag.
 Use a forklift to raise the UPS from the
floor.
 Remove the two wooden plates "E".
NOTE !
Be aware of the heavy
weight of the UPS, in
particular
equipped
Batteries.
Installation Guide LP33 Series 20 & 30 UL S2
if
already
with
Page 19/43

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lp33 30 series

Table of Contents