Powering On The Switch - Allied Telesis AT-GS916 Installation Manual

Gigabit ethernet switches
Hide thumbs Also See for AT-GS916:
Table of Contents

Advertisement

Installation

Powering On the Switch

30
To apply power to the AT-GS916 and AT-GS924 switches, perform the
following procedure:
1. Position the power cord retaining clip in the UP position, as
illustrated in Figure 14.
Figure 14 Power Cord Retaining Clip in the UP Position
2. Apply AC power to the switch by plugging the power cord into the
AC power connector on the back panel of the unit, as illustrated in
Figure 15.
Warning
Power cord is used as a disconnection device: To de-energize
equipment, disconnect the power cord.
Figure 15 Connecting the AC Power Connector to Switch
1 0 0 - 2
4 0 V A
~
C
7
1 0 0 -2
4 0 V A
~
C

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-gs924

Table of Contents