Testing Procedure - Rinnai 0901 7042 Operation And Installation Manual

Timberflame compact
Table of Contents

Advertisement

Installation Information - Testing

Testing procedure

1.
Turn gas supply on and plug the unit into the power supply.
2.
Refer to data plate for burner pressure and remove front cover panel.
3.
Remove test point screw and attach manometer to test point. The test point is on the front
injector block.
4.
Light heater, turn to high setting and check pressures.
5.
If adjustments are necessary, the regulator is situated on the front of the gas control and
should be set to the pressures on the data plate.
6.
After checking pressures, turn the unit off, remove manometer and replace test point
screw.
7.
Turn the heater on and off a few times to check ignition.
8.
When you are satisfied that the heater is working correctly, reassemble the panels.
All burner aerations are factory preset and cannot be adjusted. If you are unable to get the
unit to operate correctly refer to troubleshooting section of this manual before contacting
Rinnai.
It may take approximately 2 hours of operation for the logs to achieve their full flame pattern
and glow. During the initial burning in period, some smoke and smell may be experienced. The
heater should be run on the high setting in a well ventilated room until these dissipate.
It is the responsibility of the installer to check that under normal conditions of the
appliance, all flue gases are exhausted to the outside atmosphere and that there are no
spillage of combustion gases into the room
Rinnai New Zealand
Compact Op/Install Manual: 10170-C 02-09
18

Advertisement

Table of Contents
loading

Table of Contents