Furuno CI-68 Installation Manual page 14

Doppler sonar current indicator
Hide thumbs Also See for CI-68:
Table of Contents

Advertisement

1. INSTALLATION OVERVIEW
4. Arrange jumper wires depending on the input power voltage, referring to the next
page.
For other voltages, see the sticker attached at inside of the transceiver unit. Also, ex-
change the FUSE 1 and FUSE 2 fuses as below.
100 VAC
200 VAC
Note: After changing the power voltage, check the appropriate box on the above stick-
er according to the voltage.
1-6
WHT
WHT
FUSE1
FGBO 5A AC250V
FGBO 3A AC250V
C 120V 110V 100V 0V 120V 110V 100V 0V
C 120V 110V 100V 0V 120V 110V 100V 0V
Trans wiring
FUSE2
FGBO 5A AC250V
FGBO 3A AC250V
100 VDC
BLK
200 VDC
BLK

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents