Epson L800 Service Manual page 52

Color inkjet printer
Hide thumbs Also See for L800:
Table of Contents

Advertisement

L800/L801
When routing the CR Motor Cable and PE Sensor Cable, refer
to
Fig.1-88
and follow the steps below.
1. Wrap the CR Motor Cable with the acetate tape A (30 mm)
at the position of 100 mm away from the acetate tape that is
on the CR Motor side.
2. Tie the two cables together with the acetate tape B (20 mm)
at the position 60mm/40mm away from the acetate tape A/
PE Sensor connector.
3. Route the center of the acetate tape A behind the convex
portion of the Main Frame, and secure the tied cables with
the hook (1) at the center of the acetate tape B so that the
CR Motor Cable faces toward you.
4. Wrap the CR Motor Cable and PE Sensor Cable with
acetate tapes (20 mm) at the positions of the hooks (2) (3),
then secure the center of the acetate tapes with Hooks (2)
(3).
CR Motor
Convex
Portion of
Main
Frame
A
Figure 1-88. Routing the Cable
Disassembly/Reassembly
PE Sensor
2
1
B
Lubrication is required. See the page given below for the
lubrication information.
Lubrication of Driven Pulley (p.90)
When installing the CR Motor, install it so that the print side
faces upwards.
Whenever the CR Motor is replaced, the required adjustments
A D J U S T M E N T
R E Q U I R E D
must be carried out.
3
: Hook
CR Motor
Figure 1-89. Reinstalling the CR Motor
Refer to "2.1.2 Required Adjustments" (p.74)
Revision A
51