Installation Check List - St. Croix SCR Installation & Operation Manual

Multi-fuel stove
Table of Contents

Advertisement

BEFORE INSTALLATION THOROUGHLY
READ AND UNDERSTAND THIS MANUAL
SAFETY NOTICE
PLEASE READ THE ENTIRE MANUAL BEFORE INSTALLING AND USING YOUR NEW STOVE. FAILURE TO
FOLLOW INSTRUCTIONS MAY RESULT IN PROPERTY DAMAGE, BODILY INJURY, OR EVEN DEATH.

INSTALLATION CHECK LIST

FOR USE IN THE U.S. AND CANADA
MOBILE HOME APPROVED
CHECK WITH LOCAL AUTHORITIES AND OBTAIN NEEDED PERMITS
WE RECOMMEND INSTALLATION BY A QUALIFIED PROFESSIONAL.
BEFORE STARTING THE STOVE FOR THE FIRST TIME
1. Under certain conditions outside combustion air is recommended. Use only approved parts. When using
outside air for combustion, check that the outside air inlet is connected to draw fresh air from outside the
building.
2. All joints of PL vent and single wall stainless steel pipe should be fastened by at least 3 screws and
correctly installed. (Follow vent manufacturer's instructions). Seal all joints with high temperature silicone
to create an airtight seal.
3. WARNING: The high temperature paint on this Stove may take several hours of burning at a high fuel
setting to cure fully. During this time, an odor that is not harmful may be evident. When odors are present,
the area around the Stove should be well ventilated.
4. Caution: The high temperature paint can be easily scratched prior to burning the Stove.
CAUTION: FAILURE TO FOLLOW THE INSTRUCTIONS IN THE INSTALLATIONS MANUAL
MAY RESULT IN A HOUSE FIRE. PLEASE FOLLOW INSTALLATION AND MAINTENANCE
INSTRUCTIONS.
Lincoln SCR Manual
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lincoln scr

Table of Contents