Venting: Termination Clearance Requirements - St. Croix SCR Installation & Operation Manual

Multi-fuel stove
Table of Contents

Advertisement

VENTING: TERMINATION CLEARANCE REQUIREMENTS

THE EXHAUST TERMINATION LOCATION MUST BE AT LEAST
1' (305 mm)
7' (2.1 m)
1' (305 mm)
3' (915mm)
2' (610 mm)
Figure 5
ABOVE the ground level
FROM a public walkway
FROM The wall penetration point
FROM a gas meter/regulator assembly
FROM any adjacent combustibles such as:
Adjacent buildings, fences, protruding parts
of the structure, roof eaves or overhangs,
plants, shrubs, etc.
Lincoln SCR Manual
19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lincoln scr

Table of Contents