Hardware Installations and Uprades
14. Slide the carrier assembly into the upper left hard drive bay until it clicks into place. See letter
"A" in the figure below.
15. Open the connector labeled "Floppy Con" on the backplane by pulling up on the connector
cover. See letter "B" in the figure below. For assistance in locating connectors on the SATA
backplane, see
connectors on the SCSI backplane, see
16. Insert the loose end of the flat flex cable into the backplane connector. See letter "C" in the
figure.
17. Push in on the connector cover to lock the cable into place. See letter "D" in the figure.
B
18. Install the chassis cover. For instructions, see
19. (Optional) Install the front bezel. For instructions, see
20. Plug all peripheral devices and the AC power cable back into the server.
"Hot-Swap SATA Backplane
"Hot-Swap SCSI Backplane
A
Figure 51. Installing the Floppy Drive into the Chassis
Connections." For assistance in locating
Connections."
C
"Installing the Chassis Cover"
"Installing the Front Bezel."
D
TP01310
81