Finishing Material - Quadra-Fire Edge60 Owner's Manual

Zero clearance pellet fireplace nutural/curved/tuscan/studio
Table of Contents

Advertisement

EDGE 60 Pellet Fireplace
E. Finishing Material
NOTICE: Non-combustible material is not needed to finish
this appliance.
It is important that the finishing material is determined before
the appliance is secured to the floor. Depending on the fin-
ishing material and installation method, the appliance may
need to be positioned further in or out of the wall.
There are three ways finishing material can be applied:.
1. Behind the mounting frame
. Flush with the mounting frame
. Proud of the mounting frame
1. Behind the Mounting Frame
The mounting frame is designed to have a 1/ inch (1mm)
overlap on the sides and the top of the framing opening.
Figure 28.1.
Mounting Frame
Figure 28.1.
Positioning the nailing flanges:
• Slide the nailing flanges all the way to the front and this
will set the appliance for 1/ inch (1mm) sheet rock.
• If tile, marble or other flat surface finish material is desi-
ered and you want the mounting frame to cover the cut
edge, set the nailing flanges at a dimension of the sheet
rock thickness plus the finishing material thickness.
Figure 28.2.
Example: Sheetrock = 1/2 inch (13mm)
Finish Material = 3/8 inch (9.5mm)
Move flange: 7/8 inch (22mm)
Adjustment Screw
Adjustable Nailing Flange
Figure 28.2
Page 8
Finishing Material Behind
the Mounting Frame
Front of Fireplace
7/8 in
(22mm)
2. Flush with the Mounting Frame
The finish material can not be thicker than 1-1/ inches
(8mm) to use this method. Figure 28.3.
• Set the nailing flanges for sheet rock thickness and
install the appliance.
• Install the mounting frame.
• Install the finishing material to edge of the mounting
frame.
Mounting Frame
Figure 28.3.
3. Proud of the Mounting Frame
This method is mainly used for a brick or stone installation.
When finishing material is proud of the mounting frame
and front, there must be a 1-1/4 inch (mm) airflow clear-
ance in front of the mounting frame. Figure 28.4.
Finishing Material Proud of the Door Frame
Figure 28.4.
Use the masonry spacer supplied with the Front to position
the finishing material at the proper dimension. Remember
to keep the Front opening clearances in mind when finishing
material is proud of the Front. (See pages 29-30) .
• Set the nailing flanges for sheet rock thickness and
install the appliance.
• Install the mounting frame.
• Install the finishing material to edge of the mounting
frame.
• Complete the installation following all specified clear-
ances to combustibles.
7051-158
Finishing Material Flush
with Mounting Frame
Masonry Spacer
Door Frame
Maintain 1-1/4 inch (32mm) air
clearance in front of door frame
R
April 9, 2009

Advertisement

Table of Contents
loading

Table of Contents