This chapter provides a quick setup checklist to get the C2112-4G3 operational.
Inspect the shipping container that the C2112-4G3 was shipped in and note if it was damaged in
any way. If the server shows damage, file a damage claim with the carrier who delivered it.
Decide on a suitable location for the rack that supports the weight, power requirements, and
environmental requirements of the C2112-4G3 server. It should be situated in a clean, dust-free
environment that is well ventilated. Avoid areas where heat, electrical noise, and electromagnetic
fields are generated. Place the server rack near a grounded power outlet. Refer to
Precautions" on page
10.
The shipping container should include two sets of rail assemblies, two rail mounting brackets and
the mounting screws that you will use to install the system into a rack.
Read this section in its entirety before you begin the installation procedure.
Leave enough clearance in front of the rack to enable you to open the front door completely (~25
inches) and approximately 30 inches of clearance in the back of the rack to allow for sufficient
airflow and ease in servicing.