5. Verify the Switch Passes Self Test

After you have installed any modules and the optional second power supply,
but before mounting the switch in its network location, you should first verify
it is working properly by plugging it into a power source and verifying it passes
its self test.
If you have installed a second power supply, repeat these procedures with the
second power supply to verify it works correctly also.
1.
Figure 2-9. Power Connector on Back of Switch
N o t e
The Series 8200zl Switch does not have a power switch. It is powered on when
the power cord is connected to the switch and to a power source.
If your installation requires a different power cord than the one supplied with
the switch, please see the "Installation Precautions" on
2.
2-20
Connect the power cord supplied with the switch to the power connector
on the back of the switch, and then into a properly grounded electrical
outlet.
Check the LEDs on the switch and on each of the switch modules. The
LED behavior is described on the next page.
If the LED display is different than what is described, especially if the
Fault LED stays on for more than approximately 120 seconds or it starts
blinking, the self test has not completed correctly. Refer to chapter 5,
"Troubleshooting" for diagnostic help.
Connect power cord to
power connector
page
2-6.