HP ProCurve Series 8212zl Installation And Getting Started Manual page 130

Hewlett-packard switch installation and getting started guide
Hide thumbs Also See for ProCurve Series 8212zl:
Table of Contents

Advertisement

cable specifications ... B-2
connecting cables to switch ports ... 2-26
effects of non-standard cables ... 5-1
fiber-optic, specifications ... B-3
infrastructure requirements ... 2-7
length limitations ... 2-7
required types ... 2-7
serial for direct console connection ... 2-29
cables, twisted pair
category 3, 4, 5 ... B-7
connector pin-outs ... B-6
crossover cable pin-out ... B-9
HP Auto-MDIX feature ... B-6
MDI-X to MDI connections ... B-8, B-10
MDI-X to MDI-X connections ... B-9
note on requirements for 1000Base-T ... B-2
pin-outs ... B-8, B-10
specifications ... B-2
straight-through cable pin-out ... B-8, B-10
switch-to-computer connection ... B-8, B-10
switch-to-switch or hub connection ... B-9
wiring rules ... B-7
cabling infrastructure ... 2-7
CF Status LED ... 1-5
Clear button
deleting passwords ... 1-12
description ... 1-12
location on switch ... 1-3, 1-12
restoring factory default configuration ... 1-12,
5-13
to delete password protection ... 3-4
CLI prompt, console
displaying ... 2-29
configuration
checking when troubleshooting ... 5-3
DHCP/Bootp ... 3-2
IP address ... 3-3
IP address, manually ... 3-3
manager password ... 3-3
restoring factory defaults ... 1-12, 5-13
subnet mask ... 3-3
Switch Setup screen ... 3-2
connecting the switch to a power source ... 2-22
connector specifications ... A-2
2 – Index
console
checking messages during
troubleshooting ... 5-11
displaying the CLI prompt ... 2-29
features ... 2-28
how to connect in-band ... 2-28
how to connect out-of-band ... 2-28
serial cable connection ... 2-29
Switch Setup screen ... 3-2
telnet access ... 2-30, 3-5
terminal configuration ... 2-28
console port
description ... 1-11
location on switch ... 1-3
crossover cable
pin-out ... B-9
use with fixed port configurations ... B-7
D
deleting passwords ... 1-12
description
back of switches ... 1-13
front of switches ... 1-3
LEDs ... 1-4
DHCP
automatic switch configuration ... 3-2
for in-band console access ... 2-28
diagnostic tests ... 5-10
checking the console messages ... 5-11
checking the LEDs ... 5-4, 5-11
end-to-end connectivity ... 5-12
testing the switch only ... 5-11
testing twisted-pair cabling ... 5-12
DIM Status LED ... 1-5
downloading new code ... 5-14
Dwn LED ... 1-6
E
edge switch, example topology as ... 2-34
electrical specifications ... A-1
EMC regulatory statements ... C-8
environmental specifications ... A-2
EPS
LEDs ... 2-24
operating characteristics ... 2-24
operation ... 2-23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents