Installation Procedures
Summary
Follow these easy steps to install your switch. The rest of this chapter provides
details on these steps.
1.
2.
N o t e
3.
4.
5.
6.
Prepare the installation site
environment into which you will be installing the switch is properly
prepared including having the correct network cabling ready to connect
to the switch, and having a good location for the switch. See
some installation precautions.
Install switch modules
or 12 universal slots for installing any of the ProCurve Switch zl modules.
The Switch 5406zl-48G has two 24-port 10/1001000-T zl Modules
preinstalled and the 5412zl-96G has four 24-port 10/1001000-T zl Modules
preinstalled. Depending on where you will install your Series 5400zl
Switch, it may be easier to install the modules first. The modules are "hot
swappable" though, so they can also be installed and removed after the
switch is powered on.
Make sure you use only ProCurve Switch zl Modules in your Series 5400zl
Switches.
Install power supplies
up to two power supplies. It may be easier to install the power supplies
before mounting the switch. The switch must have at least one power
supply to operate.
Verify the switch passes self test
of plugging the switch into a power source and observing that the LEDs
on the switch's front panel and on the modules show correct operation.
It may be easier to verify if the switch passes self test before mounting
the switch.
Mount the switch
(page
mounted in a 19-inch telco rack, in an equipment cabinet, or on a
horizontal surface. An optional Rail Mounting Kit (5070-0145) is available
for mounting Series 5400zl Switches in a cabinet suitable for shipping. See
the installation details for more information.
Install the Grounding Wire
attached to the switch chassis, the grounding lug must be removed and a
wire crimped to it and the grounding lug must be reinstalled.
Installing the Series 5400zl Switches
(page
2-7). Make sure the physical
(page
2-9). The Series 5400zl Switches have six
(page
2-12). The Series 5406zl Switches supports
(page
2-15). This is a simple process
2-17). The Series 5400zl Switches can be
(page
2-21). If a grounding wire is to be
Installation Procedures
page 2-6
for
2-3
Need help?
Do you have a question about the ProCurve 5400zl and is the answer not in the manual?