Installation Procedures; Summary - HP E3800-24G-2SFP+ Installation And Getting Started Manual

Hide thumbs Also See for E3800-24G-2SFP+:
Table of Contents

Advertisement

Installing the Switch

Installation Procedures

J a p a n P o w e r
C o r d W a r n i n g
N o t e
2-2
Power cord, one of the following
Region
Australia/New Zealand
China
Continental Europe
Denmark
Japan
Switzerland
United Kingdom/Hong Kong/Singapore
United States/Canada/Mexico
South Africa and India
Argentina
Brazil
Thailand
Chile
Taiwan
Israel
India
Installation Procedures

Summary

1.
Prepare the installation site
ment is properly prepared, including having the correct network cabling
ready to connect to the switch and having an appropriate location for the
switch. See
page 2-4
For steps 2 and 3 below, if an E3800 switch is powered on for the first time
without a stacking module installed, stacking will be disabled and that will be
saved in the switch's running configuration. For more information, see
"Stacking Information and Topologies" on page
2.
Verify the switch passes self test
power source and observe that the LEDs on the switch's front panel
indicate correct switch operation. When self test is complete, unplug the
switch.
All 3800 Switches
8121-0857
8120-1034
8120-5336
8120-5340
8120-5342
8120-5339
8120-5334
8121-0973
8120-5341
8120-8375
8121-1132
8121-0671
8120-8389
8121-0967
8121-1009
8120-5341
(page
2-5). Ensure the physical environ-
for some installation precautions.
(page
2-23.
2-6). Plug the switch into a

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents