Verify The New Modules - Cisco Catalyst 4500e Series Installation Manual

Catalyst 4500 e-series switches
Hide thumbs Also See for Catalyst 4500e Series:
Table of Contents

Advertisement

Replacing Backplane Modules
Figure 4-23
Push the module toward the back of the chassis and make sure it is clipped in by the levers on both sides.
Step 10
(See
Figure 4-24
Step 11
Repeat Step 4 to Step 10 for the other modules you need to replace.
If you are installing a clock module, secure the module to the backplane using the screws from the earlier
Step 12
removal.
Replace the supervisor engines and switching modules to their previous slots.
Step 13
Restore power to the switch.
Step 14

Verify the New Modules

After the switch is reassembled and power is restored, connect a terminal to the supervisor engine and
monitor the boot process. Look for the following messages (or any others), which may indicate a
problem with the replaced modules:
00:00:20: %C4K_SUPERVISOR-2-MUXBUFFERNOTPRESENT: Mux buffer (WS-X4K-MUX) 3 is not present
00:00:20: %C4K_SUPERVISOR-2-MUXBUFFERNOTPRESENT: Mux buffer (WS-X4K-MUX) 4 is not present
00:00:20: %C4K_SUPERVISOR-2-MUXBUFFERNOTPRESENT: Mux buffer (WS-X4K-MUX) 7 is not present
The above messages (either at startup or output from a show logging command) indicate that the
mux-buffer is not present in slots 3, 4 and 7. You need to reinsert and reseat the modules in those slots.
If the switch has already started up, you may also verify the correct function of the new modules with
the show logging command.
Catalyst 4500 E-Series Switches Installation Guide
4-18
Correct Module Seating
Good
Figure
4-24.)
Securing the Module
Chapter 4
Removing and Replacing FRUs
Bad
OL-13972-01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents