Hatco HWB Series Installation & Operating Manual page 11

Hwb series built-in heated wells
Table of Contents

Advertisement

Installing Unit into Combustible Countertop
WARNING
To avoid any injury or damage Hatco mounting
kits must be used when mounting unit in a
combustible countertop.
NOTE: Cut opening for both the unit and control
panel before placing unit into countertop opening.
1. Cut appropriate opening in countertop. (See
Figure 10 for size requirements.)
2. Cut appropriate opening for control panel. (See
Figure 12 for size requirements.)
3. Place gasket putty around cutout edge. Make
sure the gasket putty overhangs the cutout edge.
4. Place mounting flange into countertop opening.
5. Secure mounting flange tabs to edge or
underside of combustible countertop using
appropriate hardware. (Mounting hardware not
provided.) (See Figure 7.)
NOTE: For underside mounting, tabs on mounting
flange must be bent to underside of countertop.
6. Place gasket putty around cutout in mounting
flange. Make sure the gasket putty overhangs
the flange.
7. Place the unit into the countertop opening.
8. Use a screwdriver to rotate the EZ locking
mounting system on the Built-In Heated Well
outward, to secure the unit from the underside of
the mounting flange. Twist as many tabs as
needed to secure unit to mounting flange. See
Figure 8.
9. Using a razor, carefully trim the excess gasket
putty material and remove.
Mounting Flange Tabs
Countertop Edge Mounting
Countertop Underside Mounting
Figure 7. Installation of Mounting Flange Kit
Countertop
EZ Locking
Tab
Figure 8. EZ Locking Tabs
9
INSTALLATION
Mounting Flange
Form No. HWBM-0206

Advertisement

Table of Contents
loading

Table of Contents