Chapter 3

Inspecting the Equipment

Tools Required

Installation

This chapter explains:
S
Equipment inspection
S
Required tools
S
Unpacking the cabinet
S
Parallel system setup
S
Extended Battery Module (EBM) setup and installation (optional)
S
UPS setup and installation, including UPS internal batteries
S
Parallel installation (optional)
S
Initial startup
If any equipment has been damaged during shipment, keep the shipping cartons and
packing materials for the carrier or place of purchase, and file a claim for shipping
damage. If you discover damage after acceptance, file a claim for concealed damage.
To file a claim for shipping damage or concealed damage: 1) File with the carrier
within 15 days of receipt of the equipment; 2) Send a copy of the damage claim
within 15 days to your service representative.
NOTE Check the battery recharge date on the shipping carton label. If the date has expired and the
batteries were never recharged, do not use the UPS. Contact your service representative.
To assemble the components, you may need the following tools:
S
Medium flat-bladed screwdriver
S
Short-handled #2 Phillips
S
Long-handled #2 Phillips screwdriver
S
7 and 8 mm wrench or socket
EATON BladeUPS
®
(12 kVA) User's Guide
screwdriver
®
S
164201649 Rev 4www.eaton.com/powerquality
17